Before Laying
Make sure that the substrate is adequate for the intended use of the floor , especially when heavy loads are expected to pass. Provision should be made for the insertion of expansion joints, necessary in the case of large surfaces, respecting the structural joints of the building.
Do not immerse the material in water before laying. Spread about 3-4 square meters of material on the ground, taking the tiles from different boxes to check the overall effect .